ROBUST INFRASTRUCTURE: POISED TO GROW
Our strength lies in our people who are committed to our values and who place quality and accountability above all. Our reward lies in the satisfaction of our customers and we strive to deliver for them in the most challenging of conditions and ensure that we meet our commitments.”
SAVAIR Energy Limited is a certified Project Management Company focused on offering EPC solutions in the energy & infrastructure sector. The company has over the years emerged as an integrated player in the field of concept to commissioning, in segments such as Hydrocarbons, Petrochemicals, Infrastructure, Steel, Cement, Power and Nuclear energy.
We are known for our ability to conceptualize and execute complex projects ahead of time. Savair is qualified with most of India’s Oil & Gas Majors and has the ability to bid for single project size of INR 500 crs (US$ 100mn) or more.
Since its inception in 2001, Savair has gradually evolved as a prominent name in the Oil & Gas segment and has established itself as a strong player in the manufacture of Skids & Packages as well as EPC including Balance of Plants & Revamping of Plants.
Savair is now poised to grow, having built strong domain expertise as well as a robust infrastructure which includes a 25,000 sq.ft. state of the art factory at MIDC, Ambernath which includes an available built up section of 124,000 sq. ft carpet area and 10000 sq. feet design office at Mahape, New Bombay. We are backed by a strong order book position which will ensure that we continue to grow rapidly.
Provided with a full range of integrated services for EPC plants including project management, process engineering, multi-disciplinary detailed engineering, procurement, construction, commissioning and start-up. Giving the engineering support and services after the completion of the project to increase your facilities performances.
Savair has in-depth experience in the Upstream and Midstream fields, having executed projects on the LSTK basis. Savair also caters to projects pertaining Balance of Plants and Revamping of plants.
Savair is among the few EPC companies with proven experience in both onshore and offshore projects along with revamping process plant experience.
New Propane Gas Compressor Project For ONGC, Uran
New Propane Gas Compressor Project was awarded by ONGC as a part of revamping the LPG plant at ONGC, Uran with a targeted completion period of 22 months with PMC EIL Baroda. The project had to be built in a gas processing plant which was 30 years old.
Though the project size was relatively small; all engineering disciplines were critical to it. viz. RCC foundation of 10-micron vibration tolerance, structural shed design to withstand a wind speed of 65 KMPH, mechanical piping with the majority of LTCS pipes and mechanical installation of the 3.35-megawatt centrifugal compressor with HT motor. Electricals consisting of HT and LT feeder modification and its revamping along with shifting of 10 MW load. And finally instrumentation including SIL-3 PLC and DCS hook-up apart from field instruments and cabling. Moreover, Savair had to address critical Process Design Challenges as a part of the plant data was not available in the old plant.
Technology Partners
IHI Corporation, Japan & Dresser-Rand, India
Challenges
The biggest challenge for this contract was getting the compressor delivery on time as Japan was struck by a Tsunami in the month of March 2011. The second challenge was working in a 30-year-old plant and the site was very close to the compressor house where extra safety measures were required
Reliance Gas Transportation Systems
10 instruments air compressor stations for Reliance Gas Transportation Systems
SAVAIR successfully completed the challenge of Engineering, supply and commissioning of 10 critical instruments air compressor package of 268 Kilo Watt and 15 bar pressure along with 38 nos. of 15 M3 vessels for Reliance Gas in an extremely tight schedule of 4 months for the mega infrastructure project of the Gas cross country pipeline of 1350 Kilometers. It was the most hazardous zone of the entire plant. The third challenge in the project was to carry out the job in the Brownfield without interrupting the production of LPG adhering to all stringent safety requirements. The project was completed successfully with zero accidents.
Besides this, Savair has been successful in executing the projects in the greenfield as well as brownfield hydrocarbon plants – both offshore and onshore. Savair has successfully completed construction of a complex process plant in an area which houses a 30 plus-year-old plant and completed projects on schedule. Savair has a track record of completing 2 million man-hours without any incident or accident in a brownfield project. On the other side, Savair has also completed various works for a large shipyard, Strategic institutes etc.
The proven track record in terms of Technology, Quality, and Reliability and on time completion has assured a place for SAVAIR as an emerging EPC Company in the Hydrocarbon sector.
We providing a differentiated approach and innovative solutions to address technically complex projects. Our highly skilled team of process engineers can provide the most cost-effective solution: cost, quality, and timing are the key drivers we pursue during project execution. Savair combines its design engineering expertise with its extensive fabrication knowledge, to provide the best infrastructural development for optimum efficiency.